06 Sep West Townshend Stone Arch Bridge: Week 10
Posted at 15:23h
in Uncategorized
The rebuild process continued into week ten with the building of the upstream sections of what are called "wing walls", these are the flared sections at each end of the bridge that help increase the stability of the river banks leading into the bridge and to help deflect the water into a channel to flow under the bridge in...