Phase 1 Concludes Phase 1 of the Opus 40 restoration concluded this week with the completion of the amphitheater wall and the new dry stone training wall.  The low wall wrapping in front of the amphitheater was rebuilt and then the worksite in the amphitheater was cleared of extra stone and swept clean.  The training wall was finished and coped, the...

Rebuilding continues The Opus 40 restoration returned for the pen-ultimate week of phase 1 with a crew of 7 wallers.  This week the Tall wall by the Amphitheater was completed, and the work on the entance ramp was fully completed, bringing the end of this phase within sight!  This weeks crew was: Brian Post, Michael Weitzner, Seth Harris, Ben Maron, TJ...