20 Apr Opus 40 Week 2 Time Lapse Videos Posted at 18:25h in Uncategorized by sslaadmin Ramp wall Construction begins: Over at the amphitheater the wall build begins with a lower section of large slabs that will be buried once the lower terrace is rebuilt in front.